The end of Mail Rail

In 1993, a new centralised computer-controlled system was introduced that enabled the entire railway to be controlled from a single point instead of through separate control rooms. By the late 1990s, more than six million bags of mail were carried below ground each year – that is four million letters every day.

In 2003, the system was suspended as it cost five times as much as using roads.

Related content >